VIP member
Dongguan Nine Star Thermal Shock Test Chamber, manufacturer of thermal shock test chambers
Dongguan Nine Star Cold and Hot Shock Test Chamber, manufacturer of cold and hot shock test chamber. The cold and hot shock test chamber is a testing
Product details

Dongguan Nine Star Thermal Shock Test Chamber, manufacturer of thermal shock test chambers
The cold and hot shock test chamber is a testing device that simulates rapid temperature changes in nature. It can test the physical and chemical damage to products during rapid temperature changes, identify potential quality issues, and improve and optimize them accordingly.
The cold and hot shock test chamber is an indispensable testing equipment for materials industries such as metal, plastic, aviation, aerospace, rubber, and electronics.
Dongguan Nine Star Cold and Hot Shock Test Chamber, Product Advantages of Cold and Hot Shock Test Chamber Manufacturers
1. The main core components are all sourced from international major brands such as Taikang from France, Lugo/Izumi/Mitsubishi from Japan, DANFOSS from Denmark, and Alfa Laval from SwedenSchneider, Kuaida/DuPont refrigerant from the United StatesWaiting for accessories can ensure the normal and efficient operation of the thermal shock test chamber.
2. Adopting a 7 "TFT true color LCD touch screen, it is larger, more intuitive, easy to operate, stable in operation, and more energy-efficient than other screens.
3. The evaporator adopts a water immersion leak detection method to thoroughly detect leaks and ensure stable operation of the equipment.
4. The use of modular refrigeration units ensures manufacturing quality and makes maintenance and replacement very convenient.
5. Adopting a high uniformity positive pressure air duct system, the temperature is uniformly high.
6. By adopting the latest automatic defrosting technology, the defrosting time is shortened and the efficiency of the testing equipment is greatly increased.
7. It has multiple safety protection measures, fault alarm display, and function display of fault causes and troubleshooting methods.
8. Adopting a self-developed control system with high precision and simple operation, the latest fuzzy computing technology is used to automatically analyze load capacity and adjust refrigerant flow rate reasonably, resulting in equipment energy savings of up to 20%.
Technical Specifications
modelJX-RT-200JX-RT-300JX-RT-480
control systemBalanced Temperature Control System (BTC)
high-temperature chamber+60℃~+200℃
warm-up time+60 ℃~+200 ℃, within 20 minutes
Low temperature chamberA:-55℃~+10℃
B:-70℃~+10℃
C:-80℃~+10℃
Pre cooling timeA: +20 ℃~-55 ℃, about 60 minutes
B: +20 ℃~-70 ℃, about 75 minutes
C: +20 ℃~-80 ℃, about 90 minutes
laboratoryA:-40℃~+150℃
B:-55℃~+150℃
C:-65℃~+150℃
recovery timeExposure to high temperature for 30 minutes
Low temperature exposure for 30 minutes
Within 5 minutes
Machine transfer timeWithin 10 seconds
temperature fluctuation
temperature deviation
Inner box dimensionsWidth W688080
High H505055
Deep D607593
outer box dimensionsWidth W168180180
High H200200205
Deep D180195225
Test weight10KG12KG15KG
Inner box materialSUS Advanced Stainless Steel
outer box materialSteel plate electrostatic spraying surface treatment or SUS304 high-grade stainless steel
thermal insulation materialHigh density polyurethane foam+glass wool
freezing systemAir cooled (optional water-cooled)
Stacked, fully sealed/semi enclosed compressor, environmentally friendly refrigerant (R404a/R23)
Standard AccessoriesOne test hole with a diameter of 50MM, two sets of test stands, and four movable working wheels
Power cord 2 meters, communication interface
Usage environment+5℃~+35℃
www.gaodiwenxiang.com
Online inquiry
