English

Hebei Shengjia Boiler Auxiliary Machinery Co., Ltd
Home>Products>Heavy duty plate chain slag remover
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    13503278199,13780271279
  • Address
    Botou Industrial Development Zone, Hebei Province
Contact Now
Heavy duty plate chain slag remover
ZBC heavy-duty plate chain slag remover is used for removing slag from coal-fired, steam or hot water boilers. Suitable for joint slag removal of sing
Product details
ZBC typeHeavy duty plate chain slag remover is one A continuous working slag conveying equipment consists of a transmission device, a driven device, a slag tank, and a chain scraper. The transmission device consists of an electric motor, a cycloidal reducer, an active sprocket, and a frame. The power is transmitted from the electric motor and V-belt to the reducer (the motor and reducer can also be directly connected), which drives the chain to rotate. The chain is connected by chain pins. Chain links have Stamping chain plate, Cast steel is made of two different materials. The chain and scraper slide in the slag conveying trough covered with cast stone slabs to carry away the slag. It has the characteristics of large slag removal capacity, clean slag removal, wear resistance, and long service life .

ZBC typeHeavy duty plate chain slag remover sex Specification and Boiler Matching Selection Table:

Specification Model
Slag removal rate Kg/h
Conveying length m
Power KW
Chain speed m/min
Supporting driving device
ZBC-610
5 000
≤40
3.0
3.0
XWE-85-841
ZBC-710
8 000
≤20
3.0
3.0
XWE-95-841
20~ 6 0
4.0
XWE-106-841
ZB C -810
11 000
≤25
4.0
3.5
XWE-95-841
25~ 6 0
5.5
XWE-106-841
ZBC-910
≤1 5 000
≤25
5.5
3.5
XWE-106-841
25~ 6 0
7.5
XWE-117-841
ZBC-1010
≤1 8 000
≤25
7.5
3.5
XWE-106-841
25~ 6 0
11
XWE-117-841
ZBC-1110
20 000
≤25
7.5
3.5
XWE-106-841
25~ 6 0
11
XWE-1 17 -841
ZBC-1210
22 000
≤25
7.5
3.5
XWE-106-841
30~ 6 0
15
XWE-128-841
ZBC-1310
25000
25
11
3.5
XWE-106-841
30~ 6 0
18.5
XWE-128-841
ZBC-1410
30000
25
11
3.5
XWE-117-841
30~ 6 0
22
XWE-128-841

Installation and trial operation

1During installation, ensure that the body is straight, the drive shaft and the driven shaft are parallel, the inner wall of the groove should be smooth, and wear-resistant cast stone slabs can be laid at the bottom. The pressure roller and plate chain should have good contact and flexible rotation.

2After installation, it should be run without load first1-2Hours, no abnormal phenomena, water can be injected into the tank for no-load operation test1-2Normal operation can only be carried out after hours without any abnormal phenomena. Under normal circumstances, it should not be started with a load.

During trial operation, attention should be paid to:

1)Each lubrication part should be adequately lubricated

2)All connecting parts must not be loose

3)The tension of the plate chain is moderate and runs smoothly.

3After installation, immerse the boiler slag outlet into the slag groove underwater80-200mmThe float valve can automatically control the water level and continuously replenish water consumption.

4Start the boiler before operationSlag removal machineThen start the grate. When stopping the machine, first stop the grate and wait for the ash and slag in the tank to be completely removed before stoppingSlag removal machinefunction.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!