Installation of a specialized tower lifting crane with a capacity of 25t × 10m, including the weight (individual), external dimensions, quantity, structural characteristics, installation distance, and lifting method of the component. The lifting requirements for type components can be determined by the construction site conditions (terrain, roads, adjacent buildings, obstacles, etc.). The performance of the selected lifting machinery (lifting capacity, lifting distance, boom length, turning radius, walking mode, etc.). The size of the lifting project quantity, project schedule requirements, etc. Construction strength and level. Existing or rentable lifting equipment. Safety and quality requirements, as well as economic rationality, for component hoisting.