VIP member
Sheep balance pre stripping wire
Balance pre stripping operation steps: 1. Hook one of the sheep's hind legs with the hook of the bloodletting/pre stripping automatic conveyor line; 2
Product details
Balance pre stripping operation steps:
1. The hook of the bloodletting/pre stripping automatic conveyor line hooks onto one of the sheep's hind legs;
2. The hook of the automatic leather pulling conveyor line hooks onto the two front legs of the sheep.
The speed of these two automatic lines is synchronized, with the sheep's belly facing up and back facing down, moving in a balanced manner, and pre skinning is carried out during the conveying process.
This pre stripping method can effectively control the adhesion of wool to the carcass during the pre stripping process
Online inquiry
