Shanghai Dahua Measurement and Control Equipment Factory Co., Ltd
Home>Products>Three phase multifunctional power monitoring instrument (LCD)
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
  • Address
    No. 1501 Songhua Road, Qingpu District Industrial Park, Shanghai
Contact Now
Three phase multifunctional power monitoring instrument (LCD)
Three phase multifunctional power monitoring instrument (LCD)
Product details





DH96-EL3 Pen Segment LCD Network Multifunctional Table


Functions of DH96-EL3

The DH96-EL3 pen segment LCD network multifunctional meter is an intelligent device used for medium and low voltage systems (6-35KV and 0.4KV). It integrates data acquisition and control functions, and has functions such as measuring and calculating basic single circuit AC electricity, accumulating electricity measurement, etc. It has 4 switch input monitoring, 2 relay outputs, and analog output functions. This table provides communication interfaces for connecting with computer monitoring systems and supports RS485 interface MODBUS communication protocol. The multimeter has peak valley measurement and capacity limiting functions. When the capacity reaches the limit value, the multimeter drives the circuit breaker to disconnect the power supply through the intermediate relay.



1.2. Characteristics of DH96-EL3

DH96-EL3 has powerful data acquisition and processing capabilities

It has three-phase voltage, three-phase current, average voltage and current, total active power, total reactive power, active and reactive power of each phase, power factor, power factor of each phase, system frequency, total active energy, total reactive energy, active and reactive energy of each phase. (According to the user's ability to add multiple rate functions, measurement and calculation functions for total harmonic distortion rate of voltage and current, current, 2-31st harmonic components of voltage, etc.)
It has 2 relay control outputs and can be expanded to 4 channels.
It has a maximum of 4 switch input functions and can be expanded to 6 channels.
It has analog output function and can choose 1-2 channels.
It has 50 event recording functions, which can save real-time switch input and relay output events that occur. (Only instruments with optional harmonic function have this function)
You can view various electrical parameters, operating status, etc. of a circuit and switch locally; You can view or set operating parameters and perform operations such as closing and opening.

High safety and good reliability

Multiple anti-interference measures were adopted in the design process, which enables stable operation in the power system environment. Electrostatic discharge anti-interference meets level 4; The anti-interference performance of the electric fast transient pulse train meets level 4; High voltage impact anti-interference meets level 4; Surge anti-interference meets level 3; The panel protection level meets IP54, and the shell protection level meets IP20.

.Small size, easy to install

The external dimensions comply with DIN83 × 83, DIN96 × 96, and DIN120 × 120 standards. The total length of the instrument installation is 75mm (including terminals), and it adopts a self-locking panel installation mechanism, which can be installed without screws.

The system wiring is convenient and flexible

The system wiring methods include three-phase four wire system and three-phase three wire system. (Users can set it themselves, but the wiring diagram needs to be changed)

Intuitive display and easy operation

The large-sized dedicated LCD module can display multiple information in real time, coupled with bright backlight, allowing operators to accurately read data even in poor lighting conditions. The operation method is user-friendly, and the operator can quickly master it. Reading data and setting parameters will become simple and easy to operate.

Main technical parameters


performance parameter

transport
enter
measure
amount
display
show
distribution network Single phase, three-phase three wire, three-phase four wire

electric

Pressure
Rated value AC100V, 220V, 380V (please specify when ordering)
Overload Measurement: 1.2 times instantaneous: 2 times/10s
Power consumption <0.1VA (per phase)
Impedance >1MΩ
Accuracy Accuracy level: 0.5S, RMS (true RMS) measurement

electric

flow
Rated value AC1A, 5A (please specify when ordering)
Overload Measurement: 1.2 times instantaneous: 10 times/1s
Power consumption <0.4VA (per phase)
Impedance <10mΩ
Accuracy Accuracy level: 0.5S, RMS (true RMS) measurement
Frequency 40~65Hz, accuracy level: ± 0.02Hz
Power Three phase total active and reactive power accuracy: 0.5S
Electric energy Four quadrant energy metering with active power accuracy of 0.5S and reactive power accuracy of 1
Display Switch and cycle 3 rows of LED display (programmable settings)
Event Real time loop saves 50 event records (harmonic table has this function)
Power Supply Scope of work AC, DC 85V~265V
Power consumption ≤4VA
Output Digital interface RS-485, MODBUS-RTU protocol
Pulse output 2-channel power pulse output
Switching input 4-channel switch input (expandable to 6 channels), dry contact mode
Connect when Ri<500 Ω, disconnect when Ri>100k Ω
Switching output 2-channel relay output (expandable to 4-channel)
Relay contact capacity: 5A/250V AC; 5A/30V DC
Analog output Current 4~20mA, load<390 Ω
Voltage 0~10V, load>100k Ω
environment work environment -10~55 ℃, altitude ≤ 2000m, 93% RH, no condensation, no corrosive gas
Storage environment -30~70℃
Security Voltage resistance Input and power supply>2kV; Input and output>2kV; Power supply and output>2kV
Insulation Input, output, and power supply to the chassis>5M Ω

External dimensions

Installation dimensions of the device(Unit: mm)
Appearance model Frame size Screen fitting size Hole size Installation total length remarks
Type 80 83×83 75×75 76×76 75
Type 96 96×96 90×90 91×91 75
Type 42 120×120 110×110 111×111 75


Installation method:
1) On the fixed distribution cabinet, select a suitable location to open an instrument installation hole (e.g. 91X91mm);
2) Take out the instrument and remove the fixing clip;
3) Insert the instrument into the instrument hole of the distribution cabinet for installation;
4) Insert the fixing clip of the instrument.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!